ALDOT Option 2
Design Presented at ALDOT's Meeting of May 3, 2005
Option 2 Upstream Replacement with Straight Bridge (45 MPH Design Speed)
Back to ALDOT Meeting Page
Copyright © 2008 Skye Enterprises. All rights reserved.